Most delays on clinic projects come from decisions taken too late. Settle these seven points before the contractor starts and the job runs far more smoothly.
- Number of consultation rooms and which ones need examination couches, sinks or equipment.
- Patient flow — where patients wait, register, get called in and leave, without crossing staff areas.
- Equipment list with power ratings, so electrical points and backup are sized correctly.
- Washrooms and water points, including accessibility for elderly and wheelchair users.
- Storage for files, consumables and medicines — it is always more than you think.
- Branding: logo wall, signage and colour palette at reception.
- Timeline — your target opening date, working back to approvals, fabrication and finishing.
With these settled, a turnkey team can price the job accurately and keep it on schedule. Get in touch to plan yours.